Offshore Engineering
””””Started in 1981, BSIC has undertaken a number of repairing, conversion and new building projects of offshore drilling platforms and engineering ships, including the overhauling and converting projects of offshore drilling platforms of "Bohai No. 4", "Kantan No. 2", "Bohai No. 6", "Bohai No. 10", "Shengli No. 1", and including new building projects of offshore platforms of "Shengli No. 2", "Chengdao Zhongxin No. 1", "Shengli operation No. 3", "Liaohe operation No. 1" and engineering ships of Pile driving barge ”°Sanhang No.15”±and ”°Aogong No.8”±. The BSIC has also built and delivered seven offshore drilling platforms (including ”°Test extraction No.3”±, ”°CPOE No.5”±and ”°CPOE No.6”±£¬etc.) on new shipyard since the BSIC moved to Haixiwan Base.
Shengli No. 2
Pile driving barge ”°Sanhang No.15”±
4 sets of offshore platforms under construction simultaneously
Liaohe operation No. 1
CPOE No.6
CPOE No.33